The office is headed by Sri Subh Narain Chaubey, Executive Engineer. The office is located near Kacheri Talab, Main Road Tungri, Chaibasa. The Division is divided in two sub-divisions namely 1. Chaibasa and 2. Noamundi. The Division mainly works for Pradhan Mantri Gram Sadak Yojna (PMGSY) and State Sponsored Schemes.

PRADHAN MANTRI GRAM SADAK YOJNA (PMGSY) >>

The scheme was launched on 25th December 2000 as a fully centrally sponsored Scheme to provide all weather road connectivity in rural areas of the country. The programme envisages connecting all habitations with a population of 500 persons and above in the plain areas and 250 persons and above in hill States, the tribal and the desert areas.

According to latest figures made available by the State Governments under a survey to identify Core Network as part of the PMGSY programme, about 1.67 lakh Unconnected Habitations are eligible for coverage under the programme. This involves construction of about 3.71 lakh km. of roads for New Connectivity and 3.68 lakh km. under up-gradation.

OBJECTIVES >>

The primary objective of the PMGSY is to provide Connectivity, by way of an All-weather Road (with necessary culverts and cross-drainage structures, which is operable throughout the year), to the eligible unconnected Habitations in the rural areas, in such a way that all Unconnected Habitations with a population of 1000 persons and above are covered in three years (2000-2003) and all Unconnected Habitations with a population of 500 persons and above by the end of the Tenth Plan Period (2007). In respect of the Hill States (North-East, Sikkim, Himachal Pradesh, Jammu & Kashmir, Uttaranchal) and the Desert Areas (as identified in the Desert Development Programme) as well as the Tribal (Schedule V) areas, the objective would be to connect Habitations with a population of 250 persons and above.

The PMGSY will permit the Upgradation (to prescribed standards) of the existing roads in those Districts where all the eligible Habitations of the designated population size have been provided all-weather road connectivity. However, it must be noted that Upgradation is not central to the Programme and cannot exceed 20% of the State’s allocation as long as eligible Unconnected Habitations in the State still exist. In Upgradation works, priority should be given to Through Routes of the Rural Core Network, which carry more traffic.

Bharat Nirman >>

The President of India, in his address to Parliament on 25th February, 2005, announced a major business plan for rebuilding rural India called Bharat Nirman. The Finance Minister, in his Budget Speech of 28th February, 2005, identified Rural Roads as one of the six components of Bharat Nirman and has set a goal to provide connectivity to all habitations with a population of 1000 persons and above (500 persons and above in the case of hilly or tribal areas) with an all-weather road. A total of 59564 habitations are proposed to be provided new connectivity under Bharat Nirman. This would involve construction of 1,46,185 Kms of rural roads. In addition to new connectivity, Bharat Nirman envisages up-gradation/renewal of 1,94,130 Kms of existing rural roads. This comprises 60% up-gradation from Government of India.